Check your Energy Efficiency Grant (EEG) eligibility in under 2 minutes. EEG offers up to 70% support—higher than most grants.
Eligibility Checklist
Answer these 5 questions:
Eligibility Requirements
- Your business operates in Singapore (all sectors eligible from 7 April 2026; newly eligible sectors must wait for MTI equipment-list details, while pre-approved equipment is currently available for Construction, Data Centres, Food Services, Maritime, Manufacturing, and Retail)Not completed
- Business registered and operating in SingaporeNot completed
- At least 30% local equity (Singaporean/PR) - Note: Data centre users are exemptNot completed
- Group annual sales turnover ≤ S$500 millionNot completed
- No payment or contract signed with vendor before applicationNot completed
All boxes checked? You’re likely eligible.
Two Tiers of Support
| Tier | Support Level | Cap | Best For |
|---|---|---|---|
| Base | Up to 70% | S$30,000 | Pre-approved equipment |
| Advanced | Varies | Based on energy savings | Larger investments |
What EEG Covers
EEG supports pre-approved energy-efficient equipment only. This includes:
- LED lighting systems
- Air-conditioning systems
- Refrigeration units
- Cooking hobs
- Water heaters
- Motors and drives
- Other sector-specific equipment
5-Step Quick Start
Step 1: Check Your SSIC Code
Verify your business falls under an eligible SSIC code via your ACRA bizfile.
Step 2: Find Pre-Approved Equipment
Browse the GoBusiness Gov Assist catalog for EEG-eligible equipment in your sector.
Step 3: Get Quotation
Request quotation from vendor including:
- Equipment model and specifications
- Breakdown of costs
- Installation fees (separately itemized)
Step 4: Prepare Documents
- Quotations from vendor
- Product brochures
- Financial statements
- Tenancy agreement (if deployment location differs from ACRA address)
Step 5: Apply on BGP
- Log in with Corppass
- Select Energy Efficiency Grant
- Complete application form
- Upload documents
- Submit and wait for approval
EEG vs PSG: Key Differences
| Feature | EEG | PSG |
|---|---|---|
| Support level | Up to 70% | Up to 50% |
| Cap | S$30,000 | S$30,000 |
| Focus | Energy efficiency | Productivity |
| Turnover limit | S$500M | S$100M |
| Sectors | All sectors (from 7 Apr 2026) | All sectors |
Common Disqualifiers
- No pre-approved equipment list for your sector yet (MTI details for newly eligible sectors are still pending)
- Equipment not on pre-approved list
- Contract signed before application
- Turnover exceeds S$500 million
- Less than 30% local shareholding (except data centre users)
Related Guides
-
EEG Efficiency Standards: Understanding EnterpriseSG Requirements
-
Grant Pitfalls Guide — common mistakes to avoid
-
Singapore Grants Glossary — key terms and definitions
-
Corppass Setup Guide — how to set up BGP access
Need help with your application?
Check if you're eligible and get your document checklist in 30 minutes.
Check Eligibility